Five Clauses That Cost More Than the Unit Rate: A 2027 Renewal Checklist

ExEnergy
Five Clauses That Cost More Than the Unit Rate: A 2027 Renewal Checklist

Photo: The Société Commerciale Française de l'Indochine., Public domain, via Wikimedia Commons

Every renewal conversation opens with the unit rate, because the unit rate is the only number most buyers can compare across offers. It is also the number suppliers expect to be squeezed, which is why the margin tends to reappear elsewhere in the document. The clauses below are where it goes.

To keep the figures concrete, the examples use a representative estate: fourteen electricity supply points, 6.2 GWh of annual consumption, a delivered cost of about 21.5p per kilowatt-hour and a total annual spend near £1.33 million. Adjust the multipliers to your own volumes; the structure of the exposure does not change.

1. Deemed rates for out-of-contract supply

What it is. If a contract lapses, the supply does not stop. It transfers to the supplier's deemed or out-of-contract rate — typically a standing offer materially above any competitively tendered price, and often variable.

The crux. Deemed exposure is rarely caused by indifference. It follows a missed notice window, a site that changed hands mid-term, or a meter discovered during a portfolio review that nobody had on the renewal schedule.

The question to ask. If this contract lapses, what rate will apply to each MPAN, from what date, and what notice is required to avoid it?

Worked example. Two sites averaging 250 kW slip out of contract for eight weeks while a renewal is renegotiated. Consumption over the period is roughly 336,000 kWh. At a deemed rate of 38p against a contracted 21.5p, the differential is £55,440 — and that is before any loss of pass-through terms or change in standing charges.

Benchmark. Any offer that does not state the deemed rate in writing should be treated as incomplete. Ask for the figure, not the mechanism.

2. Pass-through clauses and the definition of actual

What it is. A pass-through clause allows the supplier to recover non-commodity costs — network charges, levies, capacity market obligations — at cost. Reasonable in principle. The question is what 'at cost' means.

The crux. Some clauses permit recovery of actual charges plus an administrative margin. Others define the pass-through by reference to a schedule that may be revised at the supplier's discretion. Over a two- or three-year term, a percentage uplift on a growing cost base is a material number that never appears in the comparison table.

The question to ask. Which costs are passed through, on what basis are they calculated, and is any margin applied to them?

Worked example. Non-commodity costs of £290,000 across the estate. A 5 per cent margin on pass-through adds £14,500 a year. Over a three-year term, before any growth in the underlying charges, that is £43,500 — more than most buyers would concede on the unit rate without a fight.

Benchmark. Pass-through at actual cost, with the levy and network elements itemised on the invoice, is achievable. Uplifts on pass-through should be quantified and priced into the comparison.

3. Standing-charge and unit-rate escalators

What it is. An indexation clause fixing how the price moves after year one. Applied to a small standing charge it looks immaterial; applied to the unit rate it converts a fixed price into a floating one.

The crux. Escalators compound, and the base year matters. A clause set at RPI plus a margin, applied annually from a low inherited base, can move a rate well beyond the market within two years. Watch also for escalators applied separately to capacity and meter charges, which are sometimes index-linked when the commodity is not.

The question to ask. Which elements escalate, by what index, from what base date, and is there a cap?

Worked example. A unit rate of 21.5p escalating at RPI plus 1.5 per cent. Even at modest inflation, a two-year term could add in the region of 1.4p to the rate by year two. On 6.2 GWh, that is approximately £87,000 in the second year alone.

Benchmark. A fully fixed price for the term, or an escalator with a stated cap. Anything else should be modelled across the term, not just year one.

4. Minimum-take and take-or-pay obligations

What it is. A commitment to consume a minimum percentage of an estimated annual volume, with a shortfall charged at the contract rate.

The crux. The obligation is written when consumption is high and bites when it falls. Efficiency programmes, site closures and production changes all reduce volume and therefore create the shortfall — a supplier effectively charging the business for energy it saved.

The question to ask. What percentage of the estimated volume is committed, how is the estimate set, and how is a shortfall calculated and billed?

Worked example. Estimated volume 6.2 GWh, minimum take 85 per cent, so the committed floor is 5.27 GWh. A successful efficiency programme cuts consumption by 10 per cent to 5.58 GWh. The shortfall of 310,000 kWh against the floor is charged at 21.5p — £66,650 for electricity never supplied.

Benchmark. Where a minimum take is unavoidable, negotiate a tolerance band, an annual rather than monthly test, and a mechanism to reset the estimate when site scope changes.

5. Termination windows and automatic rollover

What it is. A notice period for terminating or renegotiating, frequently 90 days or more, with automatic continuation if it is missed.

The crux. The window falls months before the renewal date and almost never coincides with a finance calendar. It is the single most common cause of the first trap on this list.

The question to ask. What is the last date on which notice can be served, how must it be served, and what happens if it is missed?

Worked example. A 90-day window missed by ten days triggers a twelve-month rollover at the prevailing out-of-contract terms. On 6.2 GWh, a four-penny differential for a full year is £248,000.

Benchmark. All notice dates recorded in a central calendar, with a named owner and a reminder 30 days ahead. Service by a method the supplier must acknowledge.

Before you sign

Set the five traps beside the unit rate and price them across the full term, not the first year. Then confirm three things: that every MPAN appears in the schedule, that the notice date is diarised, and that the deemed rate and pass-through terms are stated in writing. The estate that does this tends to find the competitive rate was never the difficult part.

All Articles

Related Articles

When Estimates Become Liabilities: Auditing Volume Tolerance in Flexible Energy Supply

When Estimates Become Liabilities: Auditing Volume Tolerance in Flexible Energy Supply

Desynchronising the Portfolio: A Renewal Calendar for Multi-Site Energy Buyers

Desynchronising the Portfolio: A Renewal Calendar for Multi-Site Energy Buyers

Beyond the Pence per Kilowatt-Hour: Auditing Solar Export Terms Before You Renew

Beyond the Pence per Kilowatt-Hour: Auditing Solar Export Terms Before You Renew